Address |
Stanbridge Road Leighton Buzzard Bedfordshire LU7 4QH |
---|---|
County | Bedfordshire |
Telephone | 0333 566 9000 |
Fax | |
steve.shanahan@initivo.co.uk | |
Website | https://www.initivo.co.uk/ |
Contact | Steve Shanahan |
CAB member since | September 2006 |

Initivo (formerly VINCI Technology Centre) operates Europe’s largest façade testing laboratory. Based on 5.5 hectare site with a 3,600m2 indoor facility, testing includes:
- Weathertightness
- Acoustic (airborne & flanking)
- Structural
- Seismic
- Thermal.
They also construct full scale building mock-ups & prototypes, and their materials laboratory performs a range of tests on construction materials.
Initivo are an Approved Body for Curtain Walling testing: NB1766 and accredited to ISO/IEC 17025:2005 by the United Kingdom Accreditation Service (UKAS laboratory 0057).
They carry out testing in accordance with European and international standards; work can also be customised to suit client specific procedures.
For more information on product testing click here http://www.initivo.co.uk/what-we-do/product-testing/